Congress Hears NASA Heavy-Lift Proposal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Jan 13, 2011

Congress Hears NASA Heavy-Lift Proposal

Latest Plan Relies Heavily On Shuttle Technology

NASA has sent its latest interim report on heavy-lift capability to the U.S. Congress, telling the body that it would be impossible to build within the current time and budget constraints imposed on the agency. It said the same was true of any crew vehicle the rocket would carry.


NASA Image From Cooke Report

The study was mandated by the NASA Authorization Act of 2010, which became law last October.

NASA Associate Administrator for explorations systems Doug Cooke outlined the agency's basic heavy-lift concept to the NASA Advisory Council Tuesday. The launch vehicle uses shuttle engines and fuel tanks, along with larger versions of the SRBs which currently boost the shuttle into orbit. Space News reports that Cooke told the panel that the design would use "existing Shuttle main engine and booster component assets in the near term," but that the main engine technology could be upgraded when the inventory of existing engines and fuel tanks was exhausted. He said that would allow contracts already in place to be fulfilled without costly cancellations


NASA's Doug Cooke Image Credit Bill Ingalls

But, he said "to be clear, neither Reference Vehicle Design currently fits the projected budget profiles or schedule goals outlined in the Authorization Act."

The Authorization Act gives the agency another five years to field heavy lift and crew vehicles with a three-year budget of $10 billion.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC