First Flyable A350 XWB 'MSN-001' Structurally Complete | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Dec 05, 2012

First Flyable A350 XWB 'MSN-001' Structurally Complete

Aircraft Makes Its 1st Journey 'On Wheels'

Airbus has successfully completed the main structural assembly and system connection of A350 XWB ‘MSN-001’ – the first flight-test aircraft. The aircraft is shown here on its wheels for the very first time moving out of the main assembly hall (Station 40) at the recently inaugurated “Roger Béteille” A350 XWB Final Assembly Line in Toulouse. It then entered the adjacent indoor ground test station (Station 30).

The assembly work performed in Station 40 included the successful electrical power-on of the aircraft's entire fuselage and wings. Soon work in Station 30 will start by testing the aircraft's hydraulic system, followed by the full electric and hydraulic power-on of the aircraft which will be completed by around the end of the year. This will mark the start of several weeks of comprehensive functional system testing.

After the A350 XWB MSN-001 exits station 30, the aircraft will go through a series of extensive production and certification / development tests, be painted and have its engines installed. It will then be delivered to the flight-line and be readied for its first flight in mid-2013.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC