AD: International Aero Engines LLC Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Mar 23, 2020

AD: International Aero Engines LLC Turbofan Engines

AD NUMBER: 2020-05-28

PRODUCT: All International Aero Engines, LLC (IAE) PW1133G-JM, PW1133GA-JM, PW1130G-JM, PW1129GJM, PW1127G-JM, PW1127GA-JM, PW1127G1-JM, PW1124G-JM, PW1124G1-JM, and PW1122G-JM model turbofan engines.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-11-08 for all International Aero Engines, LLC (IAE) PW1133G-JM, PW1133GA-JM, PW1130G-JM, PW1129GJM, PW1127G-JM, PW1127GA-JM, PW1127G1-JM, PW1124G-JM, PW1124G1-JM, and PW1122G-JM model turbofan engines.

AD 2019-11-08 required the removal of the main gearbox (MGB) assembly and electronic engine control (EEC) software and the installation of a part and software version eligible for installation for engines that operate on extended operations (ETOPS) flights.

This AD retains the requirements of AD 2019-11-08 and requires replacement of the MGB assembly and EEC software on engines that do not operate on ETOPS flights.

This AD was prompted by multiple reports of in-flight engine shutdowns as the result of high-cycle fatigue causing fracture of certain parts of the MGB assembly.

DATES: This AD is effective April 21, 2020.

COST: The FAA estimates that this AD affects 72 engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Replace the MGB assembly

  • Labor: 13 work-hours × $85 per hour = $1,105.
  • Parts: $75,000.
  • Cost per Engine: $76,105.

Replace the EEC software

  • 3 work-hours × $85 per hour = $255 per engine.
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

ANN's Daily Aero-Linx (11.20.25)

Aero Linx: Glenn H. Curtiss Museum The Glenn H. Curtiss Museum, bearing the name of Hammondsport’s favorite son, is located on State Route 54, one half mile south of the vill>[...]

NTSB Prelim: Just Highlander

The Flight Instructor Noticed Some Engine Roughness And Diverted Toward Westwinds Airport On November 2, 2025, about 1630 mountain standard time, an experimental amateur-built Just>[...]

Classic Aero-TV: Just Like The 'Real' Thing – Redbird/Disney’s ‘Dusty’ FlightSim

From 2014 (YouTube Edition) -- Disclaimer: No Matter What He Tells You, Tom Is Not A Certified Firefighting Pilot While at EAA AirVenture 2014, ANN News Editor, Tom Patton checked >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC