Boeing: 'Getting Closer' to Assembling First 787 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jan 13, 2007

Boeing: 'Getting Closer' to Assembling First 787 Dreamliner

Boeing tells ANN that it is showing steady progress toward building the first 787 Dreamliner with the rollout of its second specially-modified freighter and a successful first pickup of 787 parts from Japan.

The load consists of section 43, a forward fuselage section made by Kawasaki Heavy Industries, and section 11/45, the center wheel well and center wing tank, made by KHI and Fuji Heavy Industries and joined at FHI. These were loaded onto the 747-400 Large Cargo Freighter -- now known as the Dreamlifter -- earlier today at Centrair Airport in Nagoya. The large composite parts are destined for Charleston, S.C.

"Today is an exciting day for Boeing and our Japanese partners," said Scott Strode, 787 vice president of Airplane Development and Production. "Transporting these parts from FHI and KHI is the first step in assembling the first 787. We're very pleased with how it went and with the quality of the parts received."

In another sign of production readiness, the second Dreamlifter rolled out of the hangar Jan. 7 in Taipei, Taiwan, sporting its distinctive new white and blue livery. The airplane will take its first flight in the next several weeks.

Three Dreamlifters are being modified by Evergreen Aviation Technologies Corporation at its facility at Taiwan Taoyuan International Airport.

FMI: www.boeing.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC