FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Fri, Sep 16, 2011

FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines

Issues Found With Certain First Stage Reduction Sun Gears

The FAA has sent a notice of an emergency AD (2011-20-51) to owners and operators of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines.

The move was prompted by failures of certain first stage reduction sun gears, manufactured by Timken Alcor Aerospace Technologies, Inc. These gears are manufactured under a part manufacturer approval (PMA) as replacement parts for installation in propeller reduction gearbox assemblies of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines. About 80 of these sun gears are suspect for having a manufacturing anomaly. About half of the suspect sun gears have already been taken out of service. This condition, if not corrected, could result in failure of the shaft portion of the sun gear, which will result in an engine in-flight shut down, possible uncontained engine failure, aircraft damage, and serious injuries.

The AD was issued after the FAA evaluated of all the relevant information, and determined the unsafe condition described previously is likely to exist or develop in other products of the same type design. The FAA has found that the risk to the flying public justifies issuing this AD on an emergency basis.

The AD requires the removal of affected PMA replacement Timken Alcor Aerospace Technologies, Inc. first stage reduction sun gear and the interacting planet gears, from the propeller reduction gearbox assembly, within 15 operating hours or 15 days after receipt of this AD, whichever occurs first.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/994D43AAE16A4BF68625790C005F46A7?OpenDocument

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC