FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Fri, Sep 16, 2011

FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines

Issues Found With Certain First Stage Reduction Sun Gears

The FAA has sent a notice of an emergency AD (2011-20-51) to owners and operators of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines.

The move was prompted by failures of certain first stage reduction sun gears, manufactured by Timken Alcor Aerospace Technologies, Inc. These gears are manufactured under a part manufacturer approval (PMA) as replacement parts for installation in propeller reduction gearbox assemblies of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines. About 80 of these sun gears are suspect for having a manufacturing anomaly. About half of the suspect sun gears have already been taken out of service. This condition, if not corrected, could result in failure of the shaft portion of the sun gear, which will result in an engine in-flight shut down, possible uncontained engine failure, aircraft damage, and serious injuries.

The AD was issued after the FAA evaluated of all the relevant information, and determined the unsafe condition described previously is likely to exist or develop in other products of the same type design. The FAA has found that the risk to the flying public justifies issuing this AD on an emergency basis.

The AD requires the removal of affected PMA replacement Timken Alcor Aerospace Technologies, Inc. first stage reduction sun gear and the interacting planet gears, from the propeller reduction gearbox assembly, within 15 operating hours or 15 days after receipt of this AD, whichever occurs first.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/994D43AAE16A4BF68625790C005F46A7?OpenDocument

Advertisement

More News

OSH25 Day Four Redux: Spirit SE-1!, H55 eFlyer, King Schools

Also: Centauri Aircraft Valkyrie, Meet the Admin, Night Airshow, Pelton Intv'w When we laid eyes on this critter, we fell in love… and then we learned the amazing story of t>[...]

ANN Thanks Our Speedy Sponsor... Blackshape!!!

Check out Blackshape in Oshkosh Display #190 Situated in the Apulian Aerospace district in Monopoli, Italy, Blackshape embodies the epitome of Italian craftsmanship, style, and qua>[...]

Alpha Systems AOA Guides ANN Oshkosh Coverage

A Powerhouse In Aviation Safety Technology, Visit Alpha Systems AOA at Osh Display#3124-3125 Alpha systems AOA has been developing and integrating Angle of Attack systems for the l>[...]

Pilot Mall Intro's High Flying Models To ANN Sponsor Lineup

High-Flying Models By PilotMall.com: Honoring Aviation's Legacy We are dedicated to preserving and celebrating our rich aviation heritage through stunning mahogany wood scale repli>[...]

CiES Fuels ANN's Oshkosh 2025 Special Event Coverage

CiES Has Pioneered Life Saving Technology Of Use To Pilots All Over The World... Booth 3119 CiES: CiES Inc. is the global leader in digital fuel quantity sensors for general aviati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC