MQ-1C Gray Eagle Extended Range Flies 41.9 Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Sep 05, 2017

MQ-1C Gray Eagle Extended Range Flies 41.9 Hours

Endurance Flight Marks Completion Of Phase 2 Flight Test

An MQ-1C Gray Eagle Extended Range (MQ-1C ER) aircraft recently completed a 41.9-hour endurance flight, exceeding the 40 hour flight test goal. The Unmanned Aircraft System (UAS), designed and developed by General Atomics Aeronautical Systems, Inc. (GA-ASI), flew out of El Mirage, Calif. in a representative U.S. Army mission configuration. Since the first flight of MQ-1C ER on October 29, 2016, the aircraft has flown 43 test flights and accumulated over 260 hours in the air.

"This is an important milestone for the MQ-1C ER program," said David R. Alexander, president, Aircraft Systems, GA-ASI. "The MQ-1C ER represents a significant enhancement in capability over the currently fielded MQ-1C and will be a game changer on the battlefield in support of our Army customer."

Starting in late August, the MQ-1C ER production aircraft will begin flight test in Dugway, Utah for evaluation of the Army's First Article Test (FAT). FAT will demonstrate MQ-1C ER's mission capabilities, which include increased range, endurance, and payload capacity.

In January 2018, MQ-1C ER will go through Logistics Demonstration (Log Demo) where aircraft maintainability will be validated. Then in March 2018, Follow-on Operational Test and Evaluation2 (FOTE2) will demonstrate the aircraft's ability to meet all Army operational requirements in preparation for fielding, which is planned for August 2018.

(Source: General Atomics news release. Image from file)

FMI: www.ga.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC