FAA Extends Comment Period For Southern CA Metroplex | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Sep 10, 2015

FAA Extends Comment Period For Southern CA Metroplex

Comments Now Accepted Through October 8

The FAA is extending the public comment period for the Draft Environmental Assessment (EA) of the Southern California Metroplex project by an additional 30 days. The comment period will now run until midnight on Oct. 8.

The latest extension allows for a full 120 days of comment on the proposed project. The FAA previously extended the comment period by 60 days in July.

The agency also has installed new features on the project website that allow people to look up current and projected flight tracks, as well as current and modeled noise levels, in their local communities using Google Earth. Additionally, the website now includes visual depictions of noise corridors and more information about all of the proposed procedures, including the latitudes and longitudes of all waypoints. This information is available under “Supplemental Materials” on the project website linked below.

The Southern California Metroplex project is a comprehensive proposal to improve the flow of air traffic into and out of Southern California by making the airspace safer and more efficient. It proposes to replace dozens of existing conventional air traffic procedures with new satellite-based procedures, which are a key component of the FAA’s Next Generation Air Transportation System (NextGen). The Metroplex proposal encompasses most of Southern California and includes six major airports.

The FAA released the Draft EA for the project on June 10, 2015 for public review and comment and held 11 public workshops in Southern California communities between June 16 and July 1, 2015. The Draft EA considers the potential environmental impacts of the project.

The Draft EA is available online and at selected libraries throughout the General Study Area.

FMI: www.metroplexenvironmental.com/socal_metroplex/socal_docs.html

Advertisement

More News

ANN's Daily Aero-Term (11.07.25): Microburst

Microburst A small downburst with outbursts of damaging winds extending 2.5 miles or less. In spite of its small horizontal scale, an intense microburst could induce wind speeds as>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (11.07.25)

“As we start to implement this drawdown in service. It will be restricted to these 40 high volume traffic markets. We’re going to ask the airlines to work with us colla>[...]

ANN's Daily Aero-Linx (11.08.25)

Aero Linx: European Association for Aviation Psychology (EAAP) Since 1956 the European Association for Aviation Psychology (EAAP) provides a forum for professionals working in the >[...]

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC