Boeing Opens Propulsion Systems Facility In South Carolina | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Feb 12, 2015

Boeing Opens Propulsion Systems Facility In South Carolina

Plant Will Manufacture Components For 737 MAX, 777X Airplanes

Boeing has opened a new propulsion engineering and assembly facility in North Charleston.

The team of engineers, manufacturing and support personnel at Propulsion South Carolina (PSC) are responsible for the design and assembly of the 737 MAX engine nacelle inlet, the design of the 737 MAX engine nacelle fan cowl and the design and engineering integration for the 777X nacelle. PSC employees have worked in other Boeing South Carolina facilities while the new building was under construction.

Propulsion South Carolina was established in May 2013 to build capability and capacity in integrated propulsion system design and assembly to support growth and enhance the performance of future airplanes. Boeing has relied on its supply chain to perform the majority of propulsion system design and assembly during the last 10 to 15 years, but is strategically bringing some of that work in-house.

Boeing Commercial Airplanes president and CEO Ray Conner was joined at the grand opening event by Governor Nikki Haley and other elected officials, community representatives and Boeing employees.

“The new propulsion center demonstrates our confidence in the Boeing South Carolina workforce and Boeing’s commitment to the state,” Conner said. “Our investment in both South Carolina and Washington state will help enable Boeing to be a preferred provider to customers and capture future airplane market demand by delivering competitive and high-performing products such as the 737 MAX and 777X.”

The 225,000 square foot facility will include state-of-the-art automated manufacturing equipment to efficiently assemble the 737 MAX engine nacelle inlets when production begins later this year. It also provides office space for engineering design, production and support staff.

(Images from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (11.14.25): Marker Beacon

Marker Beacon An electronic navigation facility transmitting a 75 MHz vertical fan or boneshaped radiation pattern. Marker beacons are identified by their modulation frequency and >[...]

Aero-News: Quote of the Day (11.14.25)

“Aviation is an incredible tool for Samaritan’s Purse. After a disaster strikes, we want people to know why we are bringing life-saving supplies. We want them to know t>[...]

Classic Aero-TV: CiES All-Digital Fuel Senders

From 2024 (YouTube Edition): New Capabilities For Business Aviation CiES Corporation President Scott Philiben walked Aero-News Editor in Chief Jim Campbell through some of what set>[...]

Airborne 11.10.25: Affordable Expo Succeeds, Citation Ascend, Kenai Shuts Down

Also: Duffy Predicts ‘Mass Chaos’, Modern Skies Coalition, More Impacts, Archer Buys Hawthorne With only a few months of preparation—and minimal outside media sup>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC