Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-AffordableFlyers-05.08.25

AirborneUnlimited-05.09.25

Wed, May 21, 2014

Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport

Normal Operations Expected To Resume By June 6

The City of Kissimmee Gateway Airport announces that the construction on Runway 06/24 is coming to a close.  The construction is coming into its final phase, which will include cutting grooves into the new asphalt to improve braking action. While this work will take place during normal business hours during the week of May 29 thru June 1, there is a potential for noise and vibration to be encountered by those in close proximity to the airport.  The runway is expected to return to normal operations by Friday, June 6.

Runway 06/24 is only operated when strong winds blow out of the east or west, or when the main runway is closed for maintenance or aircraft emergencies, however these events can mean the runway is used continuously for several days at a time.
 
The $2.7 million dollar project, funded by the FAA, Florida Department of Transportation and Kissimmee Gateway Airport funds, was the first major resurfacing since the 1980’s, and the new LED airfield lights installed as part of the project will generate significant energy savings.

(Image provided by City of Kissimmee, FL)

FMI: www.kissimmeeairport.com

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

ANN's Daily Aero-Term (05.13.25): Cleared For The Option

Cleared For The Option ATC authorization for an aircraft to make a touch-and-go, low approach, missed approach, stop and go, or full stop landing at the discretion of the pilot. It>[...]

Aero-News: Quote of the Day (05.13.25)

“...no entity, whether a division of government or a private company or corporation, may use information broadcast or collected by automatic dependent surveillance-broadcast >[...]

Aero-News: Quote of the Day (05.14.25)

“While our traditional mechanical magnetos will be around for a long time, Hartzell Engine Tech acquired E-MAG to expand its PowerUP Ignition System product portfolio into bo>[...]

ANN's Daily Aero-Term (05.14.25): Flight Check

Flight Check A call-sign prefix used by FAA aircraft engaged in flight inspection/certification of navigational aids and flight procedures. The word “recorded” may be a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC