Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, May 21, 2014

Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport

Normal Operations Expected To Resume By June 6

The City of Kissimmee Gateway Airport announces that the construction on Runway 06/24 is coming to a close.  The construction is coming into its final phase, which will include cutting grooves into the new asphalt to improve braking action. While this work will take place during normal business hours during the week of May 29 thru June 1, there is a potential for noise and vibration to be encountered by those in close proximity to the airport.  The runway is expected to return to normal operations by Friday, June 6.

Runway 06/24 is only operated when strong winds blow out of the east or west, or when the main runway is closed for maintenance or aircraft emergencies, however these events can mean the runway is used continuously for several days at a time.
 
The $2.7 million dollar project, funded by the FAA, Florida Department of Transportation and Kissimmee Gateway Airport funds, was the first major resurfacing since the 1980’s, and the new LED airfield lights installed as part of the project will generate significant energy savings.

(Image provided by City of Kissimmee, FL)

FMI: www.kissimmeeairport.com

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC