AD: The Boeing Company | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jun 05, 2012

AD: The Boeing Company

AD NUMBER: 2012-11-03

PRODUCT: All Boeing Model 777 airplanes
SUBJECT: Airworthiness Directive 2012-11-03
ACTION: Final Rule

SUMMARY: This AD was prompted by four reports of retaining cross bolt hardware not fully engaged into the fuse pins of the forward trunnion lower housing of the main landing gear (MLG), which could result in an incorrect MLG emergency landing break-away sequence. This AD requires a detailed inspection of the fuse pin cross bolts and fuse pins of the left and right MLG forward trunnion lower housing to verify that the cross bolts are correctly installed and that there are no missing fuse pins, and replacement of the fuse pins if necessary.

The FAA is issuing this AD to prevent an incorrect emergency landing MLG break-away sequence, which could result in puncturing of the wing box and consequent fuel leaks and an airplane fire. Failure of the fuse pins could also result in a possible landing gear collapse causing a runway excursion during take-off or landing.

DATES: This AD is effective July 9, 2012.

FMI: AD

 


Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC