Stelia Aerospace Delivers The First BelugaXL Cargo-Door | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 22, 2017

Stelia Aerospace Delivers The First BelugaXL Cargo-Door

First Aircraft To Enter Service In 2019

Airbus has taken delivery of the first main cargo door for the BelugaXL from its supplier Stelia Aerospace. The door is fully equipped with its electric and hydraulic systems. This delivery follows that, early July, of the upper fuselage section, to which the cargo-door will be attached and articulated.

Just like the upper fuselage section, the cargo-door was forwarded last night by road from the Stelia Aerospace plant to Rochefort commercial port, and placed onboard the barge used for the transport of the A380 sections.

It will then be shipped by sea and river to the port of Langon near Bordeaux, then by road following the A380 special transport itinerary, from Langon to Toulouse, where the super-transporter’s final assembly line is located.

With its outstanding dimensions - 10 m (33 feet) long, 9 m (30 feet) deep and 8 m (26 feet) high – this door, with a total weight of 3.4 tons including its systems, and a surface of nearly 140 sq. meters (1,507 sq. feet), is the largest aircraft door ever manufactured in Europe. Bearing specific complex opening and closing systems, this door will enable the loading / unloading of the payload inside the BelugaXL.

Since January 2015, the teams of three Stelia Aerospace sites (Rochefort, Saint- Nazaire and Toulouse) have worked together to ensure the design, manufacturing, assembly and equipment of this "work package", with its associated mechanisms.

After being designed by the Toulouse and Rochefort design offices, the elementary parts were manufactured by the Rochefort and Saint-Nazaire sites as well as Stelia Aerospace’s suppliers, the assembly and testing being then carried out at Rochefort.

“Stelia Aerospace teams and myself are very proud of this new delivery, on time, after 3 years of intense and close work between our different sites and our customer’s teams," said Cédric Gautier, CEO of Stelia Aerospace. "Our teams have once again demonstrated their ability to deliver on time a complete 'plug and play' section."

The BelugaXL, a latest generation aircraft (derived from the Airbus A330), is the successor of the current BelugaST (derived from the Airbus A300). The program was launched in November 2014, in order to address Airbus’ transport capacity requirements due to production ramp-up. In this context, the aircraft manufacturer decided to expand its existing BelugaST fleet with the development and production of five new BelugaXL aircraft, which will gradually enter into service as from 2019. After the delivery by the Méaulte plant, on 30th May, of the first nose section of the BelugaXL, fully equipped with its electric and fluid systems, and the delivery on 8th July, by the Rochefort site, of the upper fuselage section, this delivery is the third section delivered by Stelia Aerospace for the first of Airbus’ future super-transporter.

(Image provided with Stelia Aerospace news release)

FMI: www.stelia-aerospace.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC