USAF Moves Forward With Future Bomber | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Jul 15, 2014

USAF Moves Forward With Future Bomber

RFP Issued July 9, Contract Award Anticipated In Spring 2015

The U.S. Air Force released its Long Range Strike Bomber, or LRS-B, request for proposal July 9 with a contract award expected in spring 2015. The new bomber is a top modernization priority for the Air Force and will provide the United States with the option to hold any target at risk at any point around the world.

“The LRS-B will be an adaptable and highly-capable system based upon mature technology,” said Secretary of the Air Force Deborah Lee James. “We have established an achievable and stable set of requirements that should make this capability a hallmark for the future. We’ve set a realistic target cost for the system and have a procurement strategy which allows us to affordably field a new bomber fleet. The program’s strategy will ensure we get the best possible deal for the taxpayer.”

The new bomber will be a long-range, air-refuelable, highly survivable aircraft with significant nuclear and conventional stand-off and direct-attack weapons payload. The LRS-B will provide operational flexibility across a wide range of military operations.

"The long range strike bomber will be essential to our ability to win a full-spectrum conflict in the future. It is a must-have capability," said Air Force Chief of Staff General Mark Welsh.

The Air Force plans to purchase 80-100 LRS-B aircraft at a $550 million average unit procurement cost in base year 2010 dollars with an initial capability in the mid-2020s.

A request for proposal, or RFP, defines a future contract’s requirements and informs industry on how to respond in their proposals. Release of the RFP precedes competitive selection based on contractor proposals.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (07.12.25): Secondary Radar/Radar Beacon (ATCRBS)

Secondary Radar/Radar Beacon (ATCRBS) A radar system in which the object to be detected is fitted with cooperative equipment in the form of a radio receiver/transmitter (transponde>[...]

ANN's Daily Aero-Linx (07.12.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Of the Aeropup and its Pedigree

From 2023 (YouTube Edition): Barking up the Right Tree Australian-born, the Aeropup is a remarkably robust, fully-customizable, go-anywhere, two-seat, STOL/LSA aircraft. The machin>[...]

Airborne 07.07.25: Sully v Bedford, RAF Vandalism, Discovery Moving?

Also: New Amelia Search, B737 Flap Falls Off, SUN ‘n FUN Unveiling, F-16 Record Captain Sully Sullenberger, the pilot who saved 155 people by safely landing an A320 in the Hu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC