F-35C Completes Initial Catapult Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Nov 01, 2011

F-35C Completes Initial Catapult Testing

Aircraft Performed 'Better Than Predicted'

F-35 integrated test force personnel and F-35C test aircraft CF-3 returned to NAS Patuxent River last week after completing two major catapult test events. Starting this past summer, the test team put the carrier variant of the Joint Strike Fighter through its first set of catapult launches. The goal was to complete an initial structural survey of the aircraft to withstand launch stresses and the impact of steam ingestion into the engine.

U.S. Navy Photo

"The testing went very well," said Tom Chaillou, lead government ship suitability engineer. "The aircraft completed the structural survey, and the steam ingestion was a non-factor. The team spent a lot of time up at Lakehurst [NJ] away from home, and just did a tremendous job."

The team completed more than 50 launches to collect the needed data. The steam ingestion data produced robust results, allowing the team to reduce the number of test launches by four. "[The F-35C] did really well from the cockpit perspective," said Cmdr. Eric Buus, F-35 test pilot. "The aircraft actually flew away after launch a bit better than was predicted."

Catapult testing will continue at Lakehurst and Patuxent River to include launches at varying weights and stores, and with increased mission system functionality.

The F-35C carrier variant of the Joint Strike Fighter is distinct from the F-35A and F-35B variants with its larger wing surfaces and reinforced landing gear to withstand catapult launches and deck landing impacts associated with the demanding aircraft carrier environment. Initial carrier trials for the F-35C are scheduled for 2013. The F-35C is undergoing test and evaluation at NAS Patuxent River before delivery to the fleet.

FMI: www.navy.mil

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC