Navy to Begin Initial Production Of P-8A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Jan 26, 2011

Navy to Begin Initial Production Of P-8A

This First LRIP Contract Also Includes Spares, Logistics And Training Devices

The U.S. Navy announced today the award of a $1.6 billion contract to Boeing for P-8A Poseidon aircraft Low-Rate Initial Production (LRIP) of six aircraft. This first LRIP contract also includes spares, logistics and training devices. Production of the first LRIP aircraft will begin this summer at Boeing's Renton, Wash. facility.

"In 2004, the U.S. Navy and the Boeing Company made a commitment to deliver the next generation maritime patrol and reconnaissance aircraft to support a 2013 Initial Operational Capability (IOC)," said Capt. Mike Moran, PMA 290 Program Manager. "This contract and these aircraft keep that commitment on track."

Three of the six flight test aircraft, built as part of the System Development and Demonstration contract awarded to Boeing in 2004, are in various stages of testing at Naval Air Station Patuxent River, Md. The Integrated Test Team has conducted sonobuoy releases and counter measures deployments.

Recently, one of two static test planes completed full scale testing on the P-8A airframe. The first static test aircraft underwent 154 different tests with no failure of the primary structure. The second aircraft will begin fatigue testing this year. The U.S. Navy plans to purchase 117 production P-8A aircraft to replace its P-3 Fleet. IOC is planned for 2013 at NAS Jacksonville, Fla.

FMI: www.navair.navy.mil

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC