Endeavour Crew Gets Down To Business | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.13.25

AirborneUnlimited-05.14.25

Airborne-FlightTraining-05.15.25

AirborneUnlimited-05.16.25

Thu, Aug 09, 2007

Endeavour Crew Gets Down To Business

Heat Shield Inspection, Docking Preparations Slated For Thursday

With the exhilaration of launch still fresh on the minds of the astronauts onboard Endeavour, on Thursday the crew got down to business... inspecting the orbiter's heat shield, and readying the shuttle for Friday's scheduled rendezvous with the International Space Station.

NASA tells ANN pilot Charles Hobaugh, and mission specialists Tracy Caldwell and Rick Mastracchio are using the shuttle’s robotic arm and the Orbiter Boom Sensor System (OBSS) to take an extensive and detailed look at the orbiter’s thermal protection system. Mission specialists Dave Williams and Barbara Morgan will join Mastracchio for the latter part of the survey.

The crew of the space shuttle Endeavour was awakened for its first full day in orbit at 0837 EDT by the song "Where My Heart Will Take Me," performed by Russell Watson. The song -- Trekkers will recognize it as the theme to "Star Trek: Enterprise" -- was played for Mission Specialist Rick Mastracchio.

In preparation for Endeavour’s rendezvous and docking with the space station, crew members will also install a centerline camera, to assist Commander Scott Kelly in piloting the orbiter during its approach to the station docking port. Crew members also will check out rendezvous tools and extend the Orbiter Docking System ring.

Endeavour is scheduled to dock at 1353 EDT Friday.

FMI: www.nasa.gov/shuttle

Advertisement

More News

NTSB Prelim: Hy-Tek Hurricane HP

About 100 Ft Above Ground Level, The Engine Lost Total Power On April 14, 2025, about 1003 Pacific daylight time, an experimental amateur-built Hy-Tek Hurricane HP, N9088G, was sub>[...]

ANN's Daily Aero-Term (05.14.25): Flight Check

Flight Check A call-sign prefix used by FAA aircraft engaged in flight inspection/certification of navigational aids and flight procedures. The word “recorded” may be a>[...]

Aero-News: Quote of the Day (05.14.25)

“While our traditional mechanical magnetos will be around for a long time, Hartzell Engine Tech acquired E-MAG to expand its PowerUP Ignition System product portfolio into bo>[...]

ANN's Daily Aero-Term (05.15.25): Primary Radar

Primary Radar A radar system in which a minute portion of a radio pulse transmitted from a site is reflected by an object and then received back at that site for processing and dis>[...]

Airborne 05.12.25: $1M Flying Car, Marion Airport Saved, AirVenture Cup

Also: ‘Sonoran Beauty’ Jump-Qualified, IAG Orders, FAA Shuts Down ATC Oversight, EAA Joins Modern Skies Slovakia-based developer Klein Vision recently unveiled the prod>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC