First Airbus Building In Mobile, AL Taking Shape | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Jan 28, 2014

First Airbus Building In Mobile, AL Taking Shape

Milestone Reached With Final Truss Lifted Into Place

With the placement of the final truss atop the roof last week, the construction of the first building in the Airbus Mobile Assembly Line complex has reached an important milestone. The entire “skeleton” of the building can now be seen. This building is the Final Assembly Line Hangar, which is where A320 family aircraft will be assembled. The milestone was celebrated with the construction crew and project team members signing the final truss before it was lifted into position. 

Construction contracts for the other buildings in the complex will be awarded soon. Aircraft assembly is scheduled to begin in 2015, with first deliveries from the Mobile facility beginning in 2016. Airbus anticipates the facility will produce between 40 and 50 aircraft per year by 2018.

First announced in July of 2012, the plant is located at the Brookley Aeroplex in Mobile, Alabama. It will be the company’s first U.S.-based production facility for airliners. Airbus stressed at the time that the assembly line is part of its strategy to enhance Airbus’ global competitiveness by meeting the growing needs of its customers in the United States and elsewhere.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC