Triumph Extends Long-Term Composite Work Contract With Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, May 03, 2018

Triumph Extends Long-Term Composite Work Contract With Boeing

Supplies Detail And Assembly Parts For Dreamliners

Triumph Group has reached an agreement with Boeing to extend its current long-term agreement to supply composite detail and assembly parts for the Boeing 787 Dreamliner. Under the agreement, Triumph Aerospace Structures’ business based out of Milledgeville, Georgia will continue production of composite parts for the 787, section 47/48 fuselage to be shipped directly to Boeing’s North Charleston, South Carolina facility for integration into the aft body section of the airplane.

“This long-term extension award for composite parts at our Milledgeville site supports our strategic initiative to drive organic growth and build long-term stability for the company,” stated Pete Wick, executive vice president of Triumph Aerospace Structures. “It is also an integral step in further strengthening our partnership with Boeing.”

Since the original contract award in 2009, Triumph has provided composite frame assemblies and details for more than 745 Dreamliner airplanes. Triumph Group provides substantial content for the 787 program spanning cabin insulation, ducting, electric brake actuation, actuation for cargo and landing gear doors, and main and nose landing gear extension, in addition to composite and metal structural components and assemblies.

Triumph’s Milledgeville site serves as the company’s Center of Excellence for composite work and assemblies. Its product lines include acoustic engine nacelles, flight control surfaces and fuselage support structures.

(Source: Triumph Group news release. Image from file)

FMI: www.triumphgroup.com

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC