Final Assembly Begins On Second 787 Flight Test Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Sat, Feb 16, 2008

Final Assembly Begins On Second 787 Flight Test Aircraft

First Plane Slated To Fly In Coming Months

Even as final checks are underway to ready the first airplane for its maiden flight, Boeing announced Friday that final assembly has begun on the second 787 Dreamliner flight-test airplane.

Loaded snugly into the first position of the 787 production system, workers in the Everett, WA-based factory can now begin joining together the fuselage sections and wings. All major joins take place in this position.

While this is the second of six flight-test airplanes, this Dreamliner is actually the fourth on the production line. It follows the two airplanes that will be used for static and fatigue testing.

Perhaps most important of all, Boeing notes vendors have improved the quality of the parts shipped to Everett for assembly -- a major sticking point on the first plane, and a large reason why that aircraft still hasn't taken to the air.

"We've received significantly less 'traveled work' on this airplane," said Steve Westby, vice president of 787 Final Assembly and Change Incorporation. "The degree of completeness of sections at the partners is significantly better than Airplane #1. Condition of assembly is much better and we will see continued improvements on the condition of each assembly shipped. All this helps to bring us back into alignment with the original design of our production system."

Boeing adds production is going well on subsequent airplanes, too, with 21 airplanes currently in various stages of production. This number includes the static and fatigue airplanes, which will not be delivered to customers.

Since its launch in April 2004, the 787 Dreamliner has amassed 857 firm orders valued at $144 billion from 56 airlines. The first 787 is slated to take flight by the end of June... close to one year after the aircraft was rolled out.

FMI: www.boeing.com

Advertisement

More News

OSH25 Day Four Redux: Spirit SE-1!, H55 eFlyer, King Schools

Also: Centauri Aircraft Valkyrie, Meet the Admin, Night Airshow, Pelton Intv'w When we laid eyes on this critter, we fell in love… and then we learned the amazing story of t>[...]

ANN Thanks Our Speedy Sponsor... Blackshape!!!

Check out Blackshape in Oshkosh Display #190 Situated in the Apulian Aerospace district in Monopoli, Italy, Blackshape embodies the epitome of Italian craftsmanship, style, and qua>[...]

Alpha Systems AOA Guides ANN Oshkosh Coverage

A Powerhouse In Aviation Safety Technology, Visit Alpha Systems AOA at Osh Display#3124-3125 Alpha systems AOA has been developing and integrating Angle of Attack systems for the l>[...]

Pilot Mall Intro's High Flying Models To ANN Sponsor Lineup

High-Flying Models By PilotMall.com: Honoring Aviation's Legacy We are dedicated to preserving and celebrating our rich aviation heritage through stunning mahogany wood scale repli>[...]

CiES Fuels ANN's Oshkosh 2025 Special Event Coverage

CiES Has Pioneered Life Saving Technology Of Use To Pilots All Over The World... Booth 3119 CiES: CiES Inc. is the global leader in digital fuel quantity sensors for general aviati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC