FAA: First Phase of Next Generation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Feb 07, 2003

FAA: First Phase of Next Generation

FAA Awards Contracts for Air Traffic Control Communications

The U.S. Department of Transportation’s Federal Aviation Administration (FAA) today awarded contracts to ITT Industries, Inc., Ft. Wayne, IN and Harris Corporation, Melbourne, FL, valued at $16 and $21 million, respectively, over a 20-month period for the initial phase of NEXCOM, the Next Generation Air/Ground Communications System. 

NEXCOM will integrate data link with digital voice, make more efficient use of the available frequency spectrum, and support continued industry growth by accommodating additional air traffic control sectors and new runways. The existing air/ground communications system has been used for air traffic control for more than 50 years.

Analyses by the International Civil Aviation Organization (ICAO), RTCA, and the FAA have determined that a shortage of frequency spectrum will limit growth in aviation in about seven years. This initial phase of the program further develops a digital solution to the spectrum depletion problem.

Harris and ITT will produce a package that includes the architecture, equipment specifications, and supporting technical documents. They also will develop engineering design models of NEXCOM ground network systems and use them to demonstrate a specified set of NEXCOM capabilities.

FMI: www.faa.gov

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC