T-45 Safety Pause Caused By Engine Blade Failures | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Oct 26, 2022

T-45 Safety Pause Caused By Engine Blade Failures

"CNATRA Made The Decision To Halt All T-45C Goshawk Operations..."

The Chief of Naval Air Training (CNATRA) placed the Navy and Marine Corps’ fleet of T-45Cs on a safety pause several days ago in order to review an engine blade fault.

"Out of an abundance of caution and concern for the safety of our aviators, CNATRA made the decision to halt all T-45C Goshawk operations following the discovery of an engine blade failure,” said CNATRA Rear Adm. Richard Brophy. “We are working with our partners toward a swift resolution. Safety is at the core of our operations, and we must not expose our pilots or aircraft to unnecessary risk." 

Rear Adm. John Lemmon, Program Executive Officer for Tactical Aircraft Programs (PEO(T)), said, “The Naval Undergraduate Flight Training Systems Program Office, Naval Air Warfare Center Aircraft Division, Chief of Naval Air Training and Fleet Support Team have been working around the clock with industry partner Rolls Royce to identify the root cause of the recent T-45 engine blade failure. Engineering analysis has been underway and will continue until we can safely return the T-45 fleet to a flying status to support CNATRA’s training.”

During meetings with NAS Pensacola leadership Congressman Matt Gaetz noted that, "As we stand now, if we are able to review the engine and component parts at the pace we are currently reviewing them and clearing aircraft for restart when the pause is lifted, then we will be able to accommodate our current students and expected students without delays and certainly meeting the requirement of putting well trained Navy pilots into the fight."

The length of the pause is as yet undetermined.

FMI: www.navair.mil

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC