Griffin Warns NASA Workers Of Job Cuts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, May 22, 2005

Griffin Warns NASA Workers Of Job Cuts

Planning Ahead For 2010

NASA Administrator Michael Griffin met with workers at Kennedy Space Center Friday to discuss upcoming job changes and cuts. He said that many jobs will have to change and some will be lost as the agency prepares to shut down the shuttle program and develop a new spaceship.

"I report to the president," said Griffin according to media reports. "The president has said we're retiring the orbiter by 2010, and that's what we're doing."

"Not everyone will transition," he said. "One of the main issues with the orbiter is how much it takes to care and feed the fleet."

Griffin warned employees that the transition will be a challenge. "You enter a period where you need to watch out for yourself, and you need to look out for new opportunities."

"The new system must have lower fixed costs," Griffin said of the proposed Crew Exploration Vehicle in a hearing before a Senate oversight committee Wednesday. "Lower fixed costs means a smaller work force."

Griffin said that he would be would be working to narrow the gap between the retirement of the shuttles and the replacement ship to reduce the loss of skilled workers. However, he will not rush the project.

"If it takes more than five years, then it does," said Griffin according to Florida Today. "It will take what it takes."

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC