FAA May Drop RVSM Application Requirement For Planes With ADS-B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Aug 09, 2017

FAA May Drop RVSM Application Requirement For Planes With ADS-B

Current Approval Process For Reduced Vertical Separation Minimum Authorization Would Remain In Place For Those Aircraft That Need It

The FAA is proposing to change the Reduced Vertical Separation Minimum (RVSM) authorization process by eliminating the need for U.S.-registered operators to apply for RVSM authorization when their aircraft meet altitude-keeping requirements and are equipped with qualified Automatic Dependent Surveillance-Broadcast (ADS-B) Out systems.

The FAA has been a major force in the implementation of RVSM since it was first introduced in 1997. RVSM reduced the vertical separation between aircraft above 29,000 feet from a minimum of 2,000 feet to 1,000 feet. This saves fuel and increases airspace capacity. RVSM airspace has now been implemented worldwide.

Currently, operators must prove their aircraft design satisfies RVSM performance requirements and that they have policies and procedures for the safe conduct of RVSM operations, before the FAA approves their RVSM authorization. Until recently, they also had to have a separate program to maintain RVSM systems and equipment. The FAA granted authorizations to operate in RVSM airspace only after finding that the pertinent requirements were met.

The proposed changes for RVSM authorizations would allow the FAA to leverage the technology in ADS-B Out systems to monitor altitude-keeping performance on RVSM-capable aircraft whenever they fly in U.S. ADS-B airspace. Properly equipped aircraft could conduct RVSM operations immediately, lowering costs and eliminating the delays associated with application processing. ADS-B becomes mandatory for aircraft operating in most U.S. airspace on January 1, 2020.

The current RVSM approval process would still be available for operators whose airplanes do not routinely operate in airspace where the FAA has sufficient ADS-B data to determine RVSM performance, or when a foreign country requires a specific approval.

(Source: FAA)

FMI: www.faa.gov

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC