AD: Airbus A300 Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Oct 21, 2011

AD: Airbus A300 Airplanes

AD NUMBER: 2011-21-14

MANUFACTURER: Airbus Airplanes
SUBJECT: Airworthiness Directive 2011-21-14
ACTION: Final Rule

SUMMARY: The FAA is superseding an existing airworthiness directive (AD) that applies to certain Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model C4-605R Variant F airplanes (collectively called A300-600 series airplanes). This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

[T]he FAA has published SFAR 88 (Special Federal Aviation Regulation 88). Under this regulation, all holders of type certificates for passenger transport aeroplanes ... are required to conduct a design review against explosion risks. The replacement of some types of P-clips and improvement of the electrical bonding of the equipment in the fuel tanks [were] are rendered mandatory.

Subsequently, an internal review ... led ... to ... an additional check [for blue coat] of the bonding points in the centre tank. More recently, another internal review [introduced] additional work [installing bonding points] for aeroplanes under Configuration 03 ... and additional work [bonding the fuel jettison system–blanking plates] on the wing tanks for aeroplanes under Configuration 07.

The unsafe condition is damage to wiring in the wing, center, and trim fuel tanks, due to failed Pclips used for retaining the wiring and pipes, which could result in a possible fuel ignition source in the wing, center, or trim fuel tanks.

DATES: This AD becomes effective November 23, 2011.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC