SNC Successfully Tests Critical Dream Chaser Propulsion System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Dec 04, 2014

SNC Successfully Tests Critical Dream Chaser Propulsion System

Test Marks Completion Of CCiCap Milestone 15a

Sierra Nevada Corporation (SNC) has successfully completed a major milestone relating to the Reaction Control System (RCS) propulsion risk reduction for the Dream Chaser Space System, known as Milestone 15a. The achievement further matures the design toward Critical Design Review (CDR) and positions SNC one step closer to concluding all milestones laid out in NASA’s Commercial Crew Integrated Capability (CCiCap) agreement. According to a company news release, to date, SNC has received 96 percent of the total award value of the CCiCap agreement, having successfully completed 12 of 13 milestones.

Milestone 15a builds on SNC’s previous propulsion system innovation and development maturity by implementing a compact prototype thruster operating in a vacuum chamber to simulate an on-orbit environment. The RCS, which is being designed and tested by SNC’s wholly-owned subsidiary, Orbital Technologies Corporation (ORBITEC), provides precise on-orbit control of the Dream Chaser spacecraft for many critical maneuvers including docking of the Dream Chaser spacecraft to destinations in low-Earth orbit. The RCS also supports the unique capability of the Dream Chaser to safely return from orbit and land on any designated runway.

“Safety is paramount in the design of the Dream Chaser Space System,” said Mark N. Sirangelo, corporate vice president of SNC’s Space Systems. “It is driven by reliability, rigorous quality assurance, consistent performance, extensive testing, and robust analysis. In passing this milestone, we are able to validate our performance and safety, while decreasing the risk for this critical propulsion system. Reaching this milestone propels us even closer toward the Critical Design Review and orbital flight of our complete system.”

On August 19, 2013, SNC and NASA amended their original CCiCap Space Act Agreement to add Milestones 15a. The optional milestone provided critical hardware demonstration of the RCS technology to support crewed or uncrewed missions of the Dream Chaser Space System architecture.

(Image provided by Sierra Nevada Corp)

FMI: www.sncorp.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC