Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Dec 13, 2009

Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT

Final High-Speed Taxi Tests Completed Satisfactorily

Ready for flight... that's the feeling from many at Boeing as their 787 Dreamliner completed some of the final steps left before an actual test flight. Boeing completed high-speed taxi tests on the first 787 Dreamliner Saturday and confirmed that this is the last in a series of functional tests planned in preparation for first flight.

“Our pilots told me the airplane performed beautifully,” said Mike Delaney, vice president and chief project engineer for the 787. “We’re going through and analyzing the data to ensure we’re ready for first flight. From evaluations we’ve done so far, everything looks good.”

During the testing, the airplane reached a top speed of approximately 130 knots (150 mph, 240 kph), and the pilots lifted the nose gear from the pavement. Earlier in the week Boeing confirmed that a review and analysis of a Nov. 30 static test to validate the side-of-body modifications on the 787 Dreamliner had been completed, and the airplane structure validated for first flight.

During the test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to their limit load – the highest loads expected to be seen in service. During the test, the wing successfully deflected 18 feet, some 105 percent of the limit load. Anything over 100 percent is considered a successful test.

FMI: www.boeing.com, www.newairplane.com

Advertisement

More News

ANN's Daily Aero-Term (11.14.25): Marker Beacon

Marker Beacon An electronic navigation facility transmitting a 75 MHz vertical fan or boneshaped radiation pattern. Marker beacons are identified by their modulation frequency and >[...]

Aero-News: Quote of the Day (11.14.25)

“Aviation is an incredible tool for Samaritan’s Purse. After a disaster strikes, we want people to know why we are bringing life-saving supplies. We want them to know t>[...]

Classic Aero-TV: CiES All-Digital Fuel Senders

From 2024 (YouTube Edition): New Capabilities For Business Aviation CiES Corporation President Scott Philiben walked Aero-News Editor in Chief Jim Campbell through some of what set>[...]

Airborne 11.10.25: Affordable Expo Succeeds, Citation Ascend, Kenai Shuts Down

Also: Duffy Predicts ‘Mass Chaos’, Modern Skies Coalition, More Impacts, Archer Buys Hawthorne With only a few months of preparation—and minimal outside media sup>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC