Lockheed Martin Says F-35 Flight Test Program Made Progress In First Quarter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Apr 06, 2011

Lockheed Martin Says F-35 Flight Test Program Made Progress In First Quarter

Nearly 200 Test Flights Completed Despite Mandatory Groundings

Statistics released Monday by Lockheed Martin F-35 Lightning II show that test jets made considerable flight test progress during the first quarter of 2011, conducting 199 test flights versus a plan of 142 flights. The company said the test program remained ahead of plan despite the grounding of various test fleet aircraft for 4-15 days during the period as officials investigated the cause of a dual generator/starter failure during a flight on March 9.

Among the highlights in the report released Monday:

  • Conventional takeoff and landing (CTOL: F-35A) aircraft conducted 82 flights against the plan of 62.
  • STOVL (F-35B) aircraft conducted 101 flights against a plan of 62, and logged six times more vertical landings in the first quarter than in all of 2010.
  • Carrier variant aircraft accomplished 16 flights of 18 planned.
  • Two production-model aircraft, AF-6 and AF-7, flew for the first time in preparation for delivery to the U.S. Air Force this year. AF-6 and AF-7 flew seven times in the first quarter.
  • STOVL variant BF-1 performed the first touch-and-go maneuver in VL mode this quarter.
  • From the start of flight testing in December 2006 through March 31, 2011, F-35s have flown 753 times, including production-model flights.
FMI: www.lockheedmartin.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC