AD: International Aero Engines LLC Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Mar 23, 2020

AD: International Aero Engines LLC Turbofan Engines

AD NUMBER: 2020-05-28

PRODUCT: All International Aero Engines, LLC (IAE) PW1133G-JM, PW1133GA-JM, PW1130G-JM, PW1129GJM, PW1127G-JM, PW1127GA-JM, PW1127G1-JM, PW1124G-JM, PW1124G1-JM, and PW1122G-JM model turbofan engines.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-11-08 for all International Aero Engines, LLC (IAE) PW1133G-JM, PW1133GA-JM, PW1130G-JM, PW1129GJM, PW1127G-JM, PW1127GA-JM, PW1127G1-JM, PW1124G-JM, PW1124G1-JM, and PW1122G-JM model turbofan engines.

AD 2019-11-08 required the removal of the main gearbox (MGB) assembly and electronic engine control (EEC) software and the installation of a part and software version eligible for installation for engines that operate on extended operations (ETOPS) flights.

This AD retains the requirements of AD 2019-11-08 and requires replacement of the MGB assembly and EEC software on engines that do not operate on ETOPS flights.

This AD was prompted by multiple reports of in-flight engine shutdowns as the result of high-cycle fatigue causing fracture of certain parts of the MGB assembly.

DATES: This AD is effective April 21, 2020.

COST: The FAA estimates that this AD affects 72 engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Replace the MGB assembly

  • Labor: 13 work-hours × $85 per hour = $1,105.
  • Parts: $75,000.
  • Cost per Engine: $76,105.

Replace the EEC software

  • 3 work-hours × $85 per hour = $255 per engine.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC