DART Earns FAA Approval For Bell 205A-1/205B Drive Shaft Tunnels | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Sep 22, 2008

DART Earns FAA Approval For Bell 205A-1/205B Drive Shaft Tunnels

Can Accommodate Larger-Diameter Tail Rotor Drive Shafts

DART Helicopter Services announced recently its affiliated partner, DART Aerospace Ltd., has received FAA approval of its Drive Shaft Tunnel for 205A-1/205B helicopters. This product has been Transport Canada certified; EASA certification is pending.

The DART Drive Shaft Tunnel has been designed incorporating several features that will reduce both installation time and maintenance costs. The new tunnel is larger at the forward end than the OEM assembly it replaces, in order to accommodate the larger diameter tail rotor drive shafts now common on Bell 205s.

DART says its Drive Shaft Tunnel also provides additional clearance around the tail rotor drive shaft at the forward firewall thereby easing alignment of the drive shaft and reducing the chance of the shaft contacting the tunnel during operations.

DART's Drive Shaft Tunnel features a removable center section below the starter/generator. This panel can be easily removed to provide extra clearance for starter/generator maintenance. Additionally, this section can be removed allowing for unprecedented access to view and inspect the tail rotor drive shaft. Due to the modular design, any of the four components of the drive shaft tunnel, including the Center section, may be independently replaced, without removal of the drive shaft, in the event of damage during routine maintenance rather than replacing the entire tunnel.

"Larger diameter tail rotor drive shafts and the Bell AD requiring frequent inspections have resulted in additional costs for operators both in maintenance and down time," said Bill Beckett, General Manager DART Aerospace. "The DART Drive Shaft Tunnels are now in stock at DART so we can immediately start providing operators with an alternative that relieves many of the inherent difficulties with the product currently available to operators.

"The improved inspectability and repleaceability make this is an ideal product to incorporate during routine overhaul," he added.

FMI: www.dartaero.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC