FAA Breaks Ground For New Tucson Air Traffic Control Tower | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 21, 2014

FAA Breaks Ground For New Tucson Air Traffic Control Tower

Will Be More Than Double The Height Of The Current Facility, More Centrally Located

The FAA joined local officials Thursday in breaking ground for a new, $26 million air traffic control tower at Tucson International Airport.

At about 250 feet tall, the new tower will be more than double the height of the current tower, which is 55 years old. It will provide air traffic controllers with better airfield views and make it easier for them to determine the positions of aircraft on the ground and in the skies around the airport.

“This project is a great example of the FAA’s commitment to continually reinvesting in our nation’s transportation infrastructure,” said U.S. Transportation Secretary Anthony Foxx. “Improving our facilities and making them as environmentally friendly as possible helps maintain a cutting-edge transportation system and makes the most efficient use of taxpayer dollars.”

“The new tower’s more central location will give controllers improved views of the entire airport surface as well as the approach paths to all of the runways,” said FAA Administrator Michael P. Huerta. “It will make a safe airport even safer while providing our hard-working controllers with greatly improved working conditions.”

The new tower will be located on the south side of the airfield, south of the existing tower. It will sit on top of a 13,000 square-foot base building that will house computer equipment, administrative offices and a backup power system that is designed to automatically activate in case of a commercial power outage.

Numerous environmental features will minimize the facility’s energy and water uses.

A 1,600-panel solar farm adjacent to the base building is expected to generate all of the facility’s electrical needs for several hours a day on sunny days. At other times, the power it produces will supplement the facility’s commercial power supply.

Other environmental benefits include native desert plants that don’t need watering, motion detectors for the low-energy, indoor lights, a light-colored roof that will reflect the sun’s heat away from the building, and triple-pane windows that will reduce the amount of energy needed to keep the controller work area cool.

The total project cost, including computer equipment, electronics, fire suppression systems, and heating and air conditioning, will be about $42 million. The FAA expects to start using the new facility in 2017.

Tucson had approximately 140,000 aircraft operations in 2013. It is served by six airlines and is home to the largest F16 Air National Guard Base in the U.S.

FMI: www.faa.gov

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC