Analyst: F-35 Not Prepared To Run The Show Despite Being Officially ‘Ready’ | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 10, 2015

Analyst: F-35 Not Prepared To Run The Show Despite Being Officially ‘Ready’

Airplane, Manufacturer Still Have Hurdles To Clear, According To Analysis From FL Technics

After being developed for more than 14 years, costing more than $400 billion to make and 7 years too late, the Lockheed Martin F-35 fighter jet has finally been officially approved ‘ready for combat’ by the U.S. Marine Corps. This immense milestone in the development of the world’s most expensive weapons program has once again spurred the debate on the jet’s capabilities and its readiness to take the throne from the legendary F-16. Nevertheless, it seems like this debate could be far from over as there might be some challenges waiting ahead.

The F-35 has long been anticipated to become the most advanced new aircraft irreplaceable in conducting close air support, offensive and defensive counter air and armed reconnaissance missions. Moreover, it is supposed to be easily and cheaply maintained. Nevertheless, after exceeding the development budget by over $163 billion, the F-35 will cost up to 40 percent more to maintain than the previously exploited fighter jets, says Pentagon. The report goes on estimating that the lifetime maintenance cost of all the jets ordered by the US would exceed $1 trillion.

“Even though the F-35's Autonomic Logistics Information System or ALICE has been touted as a game-changing technology to simplify the maintenance process for the new jet, the US AF maintainers have disclosed that 80% of all issues identified by ALIS are “false positives”,” reveals Arturas Dziugelis, the Head of FL Technics Military Aviation Department. “It means that despite the aircraft being recognized as ‘ready for combat’, 5 million lines of code in the F-35’s maintenance program are not nearly close to being ready. In addition, there is the issue of mission capable rate, which is not looking good for the newcomer.”

Despite being developed back in the ‘70s, the most popular fighter plane in the world – the F-16 – holds the mission capable rate of 74.4 percent. The Joint Strike Fighter, on the other hand, is designed to have about the same rate as its predecessor, but currently it demonstrates a figure much closer to 60–65 percent for the F-35Bs which flew in a recent operational readiness inspection, according the Marines.

And it is not the only challenge for the operators of the fighter jet. As Lockheed Martin aims to sell as many as 5100 F-35s to customers around the globe, almost all of their future owners fear that the spare parts supply chain will be subject to numerous problems. Primary recipient – the USA and its officials – has not once, but several times expressed the highest ‘concern’ about spare parts and their delivery processes for the new jet.

“It seems like the transition from the old machines to the F-35 fighter jet could take some time. According to various reports, F-16s, F-15s and Russian-built aircraft such as MiG-21/29 or Su-25/27/30/33 remain among the 10 most popular active military aircraft types worldwide. In addition, all of the countries which have ordered the new jet have expressed their dissatisfaction with the whole project or even cancelled some of the orders. It is likely that they will get some confidence boost after the official approval. Nevertheless, until all of this prevails, F-16 with a very well-established network of maintenance and spare parts providers will be the only king in the castle,” Dziugelis said.

(Image provided by FL Technics)

FMI: www.fltechnics.com

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC