First Flilght: First Production CJ3 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-01.06.25

Airborne-NextGen-01.07.25

Airborne-Unlimited-01.08.25

Airborne-FltTraining-01.09.25

Airborne-Unlimited-01.10.25

Tue, Aug 12, 2003

First Flilght: First Production CJ3

001 Lifts Off Ahead of Schedule

The first production CJ3 (serial number 001) took its first flight three weeks ahead of schedule. The 1.5 hour flight took place on Friday. 

The CJ3 departed from McConnell Air Force Base and landed at Wichita's Mid-Continent Airport. This first flight of the Serial 001 aircraft was performed using a standard production first flight profile. This included the full range of airspeed from stalls to MMO, and coupled approaches.

This aircraft will be used primarily for avionics development and certification. Cessna has dedicated three Citation CJ3s to certification endeavors: a production conformed prototype, serial number 001, and 002.  The prototype made its maiden flight on April 17, 2003, and has already logged over 83 hours. Flight tests underway include climb performance and roll control
tests. 

Recent CJ3 program accomplishments are the successful completion of the low and high speed envelope expansion, mating of the wing to the fuselage on CJ3 serial number 002, completion of the first customer specification session, and painting of the prototype. The CJ3 team has also begun static testing.

The first major airframe article assessment of the tailcone and empennage was completed in late June. All static testing is expected to be completed by the first quarter of 2004.

FMI: www.cessna.com

Advertisement

More News

ANN's Daily Aero-Term (01.12.25): Parallel ILS Approaches

Parallel ILS Approaches Approaches to parallel runways by IFR aircraft which, when established inbound toward the airport on the adjacent final approach courses, are radar-separate>[...]

Aero-News: Quote of the Day (01.12.25)

“[Patrick Henry Field] is one of the pre-eminent aviation assets in the country, and certainly on the East Coast. With 1,800 acres of land and capacity for modernization, it >[...]

Aero-News: Quote of the Day (01.13.25)

“It’s a federal crime, punishable by up to 12 months in prison, to interfere with firefighting efforts on public lands. Additionally, the FAA can impose a civil penalty>[...]

ANN's Daily Aero-Term (01.13.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (01.13.25)

Aero Linx: The Vertical Flight Society (VFS) The Vertical Flight Society, formerly the American Helicopter Society (AHS), is the non-profit technical society for the advancement of>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC