Astronauts Complete Second STS-126 Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Nov 21, 2008

Astronauts Complete Second STS-126 Spacewalk

Replace 11 Of 12 Bearings In Solar Array Joint

The crew of the International Space Station celebrated the orbiting lab's 10th anniversary Thursday with a spacewalk by astronauts Heidemarie Stefanyshyn-Piper and Shane Kimbrough.

The second of four planned spacewalks planned for STS-126 began 45 minutes early, at 12:58 pm EST, and ended at 7:43 pm, running 15 minutes longer than its scheduled 6-and-a-half hours. Replacement of 11 of the 12 trundle bearings in the starboard Solar Alpha Rotary Joint race ring was successfully completed.

The repair comes almost a year after astronaut Dan Tani, in a spacewalk on November 24, 2007, noticed metallic debris on a main gear bearing race, suggesting metal-on-metal grinding which could lead to a failure of the joint.

The bearings allow rotating the solar array to track the position of the sun, which is essential to maximize power generation. The first of the 12 bearings was replaced back in June.

Now safely put in the shuttle Endeavour's payload bay, the bearings will be returned to Earth, where they'll be inspected, and engineers will try to determine what caused premature failure by subjecting the remaining good bearings to further analysis.

FMI: www.nasa.gov/station

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC