GEnx Engine Takes Flight For First Time | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, Feb 23, 2007

GEnx Engine Takes Flight For First Time

Attached To 747 Test Bed

General Electric's GEnx engine took to the skies Thursday over Victorville, CA, marking the start of flight-testing on GE's 747 flying test-bed. During the three-hour first flight, the GEnx-1B engine demonstrated aircraft systems and instrumentation functionality, climbed to more than 43,000 feet and established engine performance baselines for flight-testing.

"The engine performed extremely well, and we look forward to gaining additional valuable information on the engine's capabilities from flight-testing," said Tom Brisken, general manager of the GEnx program. "Today's flight puts us another step closer to certification later this year on the GEnx-1B engine for the Boeing 787 Dreamliner."

Preparations for the first GEnx flight on GE's flying test-bed began more than two years ago.

GE says the electrical system requirements for the Boeing 787 Dreamliner posed unique challenges. GE's 747 flying test-bed was modified to manage the electrical load from the engine's two starter-generators and to provide the power necessary for electrical ground and air starts. The modifications were completed last month, and the GEnx-1B engine was installed in the inboard location on the left wing of the aircraft in just one day.

The GEnx flight test team has a rigorous schedule ahead, with about three flights per week over the next three months. These flight-tests will evaluate the steady-state and transient performance of the engine, verify air re-starting capability, determine the combustor operability margins, validate throttle response and assess the nacelle and undercowl cooling characteristics.

The majority of the flight tests will occur in Victorville, CA with hot-day assessments taking place in Yuma, AZ and high-altitude takeoff evaluations occurring in Colorado Springs, CO. A second round of flight-testing later this year will focus on the engine control system.

FMI: www.geae.com

Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC