AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Aug 21, 2018

AD: Airbus SAS Airplanes

AD NUMBER: 2018-17-10

PRODUCT: Certain Airbus Model A300 B4-600R series airplanes, Model A300 C4-605R Variant F airplanes, and Model A300 F4-600R series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-15-17, which applied to the airplanes listed above.

AD 2017-15-17 required an inspection of the lower area of a certain frame (FR) radius for cracking, and corrective action if necessary. This AD requires new repetitive inspections of the forward fitting lower radius of a certain frame for cracking, and corrective actions if necessary.

This AD was prompted by a determination that repetitive inspections and applicable corrective actions are necessary.

DATES: This AD is effective September 24, 2018.

COST: The FAA estimates that  this AD affects 94 airplanes of U.S. registry.

  • The actions required by AD 2017-15-17, and retained in this AD, take about 4 work-hours per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2017-15-17 is $340 per product.
  • The FAA also estimates that it takes about 4 work-hours per product to comply with the new requirements of this AD, including 1 work-hour per product for reporting. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of this AD on U.S. operators to be $425 per product.
  • The agency has received no definitive data that enables it to provide cost estimates for the on-condition actions specified in this AD.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC