Ultimate Load Testing On Gulfstream G500 Validates Structural Integrity | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Sat, Jun 18, 2016

Ultimate Load Testing On Gulfstream G500 Validates Structural Integrity

Stressed To 150 Percent Load Limit, Fulfilling Certification Requirement

Gulfstream has completed ultimate load testing for its new Gulfstream G500. Ultimate load represents 150 percent of limit load and is equivalent to a 1.5 safety factor specified by the FAA and EASA. Limit load is the maximum level that an aircraft should experience once during its service life. Completion of the full-scale aircraft ultimate test fulfills the certification requirements for both the FAA and EASA.

Carried out over five months, the testing focused on the aircraft’s fuselage, wing, vertical and horizontal stabilizers and control surfaces. It involved eight primary test conditions, including wing up and down bending, horizontal up and down bending and wing torsion.

More than 6,000 channels of instrumentation, including load cells, strain gages, displacement transducers and instrumented links/pins, were used to monitor the test article’s structural response. Cameras inside the wing, empennage and fuselage allowed engineers and technicians real-time insight into the structure’s behavior.

“This is a significant accomplishment in development of the G500,” said Mark Burns, president, Gulfstream. “The successful completion of these tests confirms the airframe’s solid construction, fulfills certification requirements and clears the way for us to proceed with additional testing.”

Gulfstream will now conduct an additional company test, applying increasingly higher loads to determine the structural test article’s destruction point. Destructive testing of aircraft components is important to demonstrate and refine Gulfstream’s engineering models, designs and analysis methods.

Later this year, Gulfstream will begin a multi-year fatigue program for the G500 that will simulate three lifetimes of airframe operation.

(Source: Gulfstream new release. Image from file)

FMI: www.gulfstream.com

 


Advertisement

More News

ANN's Daily Aero-Linx (11.06.25)

Aero Linx: The International Civil Aviation Organization (ICAO) The International Civil Aviation Organization (ICAO) is a United Nations agency which helps 193 countries to coopera>[...]

NTSB Final Report: Champion 7GC

About 25 Days (9.3 Hours) Before The Accident, The Airframe Was Modified With Different Landing Gear Legs, Wheels, And Brakes Analysis: The pilot reported that during the landing r>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Aero-News: Quote of the Day (11.06.25)

“Over 2025, Vertical has shown that when we set targets, we deliver. Whilst maintaining our industry-leading capital efficiency, we are not only demonstrating all piloted fli>[...]

ANN's Daily Aero-Linx (11.06.25)

Aero Linx: Air Medical Physician Association (AMPA) The Air Medical Physician Association (AMPA) is the largest professional organization of physicians dedicated to rotor wing (hel>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC