Ariane 5 Launcher Initial Assembly Completed In French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Mon, Jun 18, 2012

Ariane 5 Launcher Initial Assembly Completed In French Guiana

Booster For The 4th Planned Launch This Year

Initial assembly of the fourth Ariane 5 for launch by Arianespace in 2012 has been completed at the Spaceport in French Guiana, marking a new milestone in preparations for a mission to loft a dual-passenger payload later in the year. The heavy-lift Ariane 5 ECA version is located in the Launcher Integration Building, where it took shape during a multi-step process that began with positioning of the vehicle’s cryogenic core stage over the mobile launch table. The two solid propellant boosters were then mated to the core stage, followed by a “topping off” installation of the cryogenic upper stage and vehicle equipment bay – which were pre-integrated as a single component.

This is the 64th Ariane 5 to take shape at the Spaceport, and will continue the cadence with Arianespace’s workhorse launcher. Designated as Flight VA208 in reference to the 208th flight of an Ariane family vehicle, the launcher is to carry a two-passenger commercial telecommunications satellite payload – the primary mission application for Ariane 5.
 
The launch will follow Arianespace’s next Ariane 5 flight (VA207), scheduled to lift off on July 5 with the EchoStar XVII high-throughput relay platform for Hughes Network Systems, and the MSG-3 meteorological spacecraft for EUMETSAT (the European Organization for the Exploitation of Meteorological Satellites).
 
The VA207 flight’s Ariane 5 currently is in the Spaceport’s Final Assembly Building, ready for integration of the EchoStar XVII and MSG-3 satellites. (Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC