New Personnel Recovery Capability Part Of HC-130J | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Sep 28, 2011

New Personnel Recovery Capability Part Of HC-130J

First Combat King II Delivered To The U.S. Air Force

The first HC-130J Combat King II has been delivered to the U.S. Air Force's Air Combat Command (ACC). It was flown to Davis-Monthan Air Force Base, AZ, by Gen. Norton A. Schwartz, chief of Staff of the U.S. Air Force. This aircraft is the first of 11 currently on order with Lockheed Martin.

File Photo

"It's an honor to have flown this magnificent aircraft from Marietta today," said Gen. Schwartz during today's ceremony.  "It's a significant milestone for the personnel recovery and the combat search and rescue community.  The capability of the HC-130 Combat King II is an order of magnitude greater than any of its predecessors, and I have to tell you it's certainly better than any Herc of any variety that I have ever flown."

"Yet again, we see the C-130 delivering a new capability," said Lorraine Martin, Lockheed Martin vice president for C-130 programs. "This new C-130J configuration gives ACC unparalleled capability for its personnel recovery mission. As worldwide demand for the C-130J increases, we see more ways this flexible aircraft meets the demands of any operator for any mission."

The new aircraft, which is based on a KC-130J tanker baseline, has the Enhanced Service Life Wing, Enhanced Cargo Handling System, a Universal Aerial Refueling Receptacle Slipway Installation (boom refueling receptacle), an electro-optical/infrared sensor, a combat systems operator station on the flight deck, and dual Satcom. In-line production of this configuration reduces cost and risk, and meets the required 2012 initial operational capability.

FMI: www.af.mil, www.lockheedmartin.com 

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC