AH-1Z Super Cobra Completes Envelope Expansion Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jan 07, 2003

AH-1Z Super Cobra Completes Envelope Expansion Testing

The first AH-1Z SuperCobra test aircraft ended 2002 on a high note having completed the envelope expansion portion of the test program and achieving more than 400 flight test hours. With envelope expansion finished, AH-1Z testers have completed the first major portion of flight testing on the Marine Corps’ newest attack helicopter.

“In envelope expansion, we essentially determine how high and how fast the aircraft can go,” explained Vic DiSanto, systems engineer with the H-1 Integrated Test Team here. “We start at a hover and go from there.”

In between, DiSanto explained, test pilots and engineers check the aircraft’s performance against engineering estimates at various airspeeds, altitudes and G loadings – from zero altitude, zero airspeed at one G (a hover) to the maximum airspeed, altitude and G loading (both negative and positive) the aircraft can safely withstand. Once validated by these tests, the data will be used as the basis for the platform’s NATOPS manual – the operating manual developed for each aircraft.

During this first phase of flight testing, AH-1Z test pilots and engineers took the test aircraft to 220 kts, maneuvered to –0.3 to +3.5 G’s and reached a 16,000-foot altitude since its first flight in December, 2000.

"Having accomplished 400 hours of envelope expansion test flying during the first 24 months of engineering and manufacturing development on this airframe exemplifies the dependability, reliability and maintainability in the design of the AH-1Z,” stated Lt.Col. Nic Hall, government flight test director for the H-1 ITT. “Especially so considering the average AH-1W fleet utilization rate is 300 hours per year."

With these milestones accomplished, the aircraft turns next to external stores jettison testing, where the aircraft tests it’s capability to safely and effectively rid itself of anything attached to its six “hard points” in the event of an emergency or malfunction.

By the holiday break, Zulu One had already flown 7.5 hours testing Hellfire missile rack jettisons. The test articles being dropped were inert and ballasted to represent fully armed and capable missiles.

Additionally, the three AH-1Z test aircraft recently supported cockpit mapping for the Thales Top Owl helmet-mounted display. [ANN Thanks John C. Milliman, PMA-276 Public Affairs Officer]

FMI: http://www.navair.navy.mil/

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC