AH-1Z Super Cobra Completes Envelope Expansion Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Tue, Jan 07, 2003

AH-1Z Super Cobra Completes Envelope Expansion Testing

The first AH-1Z SuperCobra test aircraft ended 2002 on a high note having completed the envelope expansion portion of the test program and achieving more than 400 flight test hours. With envelope expansion finished, AH-1Z testers have completed the first major portion of flight testing on the Marine Corps’ newest attack helicopter.

“In envelope expansion, we essentially determine how high and how fast the aircraft can go,” explained Vic DiSanto, systems engineer with the H-1 Integrated Test Team here. “We start at a hover and go from there.”

In between, DiSanto explained, test pilots and engineers check the aircraft’s performance against engineering estimates at various airspeeds, altitudes and G loadings – from zero altitude, zero airspeed at one G (a hover) to the maximum airspeed, altitude and G loading (both negative and positive) the aircraft can safely withstand. Once validated by these tests, the data will be used as the basis for the platform’s NATOPS manual – the operating manual developed for each aircraft.

During this first phase of flight testing, AH-1Z test pilots and engineers took the test aircraft to 220 kts, maneuvered to –0.3 to +3.5 G’s and reached a 16,000-foot altitude since its first flight in December, 2000.

"Having accomplished 400 hours of envelope expansion test flying during the first 24 months of engineering and manufacturing development on this airframe exemplifies the dependability, reliability and maintainability in the design of the AH-1Z,” stated Lt.Col. Nic Hall, government flight test director for the H-1 ITT. “Especially so considering the average AH-1W fleet utilization rate is 300 hours per year."

With these milestones accomplished, the aircraft turns next to external stores jettison testing, where the aircraft tests it’s capability to safely and effectively rid itself of anything attached to its six “hard points” in the event of an emergency or malfunction.

By the holiday break, Zulu One had already flown 7.5 hours testing Hellfire missile rack jettisons. The test articles being dropped were inert and ballasted to represent fully armed and capable missiles.

Additionally, the three AH-1Z test aircraft recently supported cockpit mapping for the Thales Top Owl helmet-mounted display. [ANN Thanks John C. Milliman, PMA-276 Public Affairs Officer]

FMI: http://www.navair.navy.mil/

Advertisement

More News

Aero-News: Quote of the Day (10.16.25)

“This integration marks a significant step forward in cockpit connectivity and safety. It is one of few solutions offered to business aviation and rotorcraft operators that p>[...]

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

ANN's Daily Aero-Term (10.16.25): Enhanced Flight Vision System (EFVS)

Enhanced Flight Vision System (EFVS) An EFVS is an installed aircraft system which uses an electronic means to provide a display of the forward external scene topography (the natur>[...]

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Unveils 50 Amp-hour Lithium-ion, Main Ship Battery >[...]

NTSB Final Report: Bellanca 17-30A

Shortly After Takeoff, The Engine Completely Lost Power Analysis: The pilot reported that the engine start, run-up, and takeoff were without incident. However, shortly after takeof>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC