Adam A700 Celebrates Year One | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Wed, Aug 18, 2004

Adam A700 Celebrates Year One

A500 Claims City Pair Records

Marking the first anniversary of the A700's debut at Oshkosh in July 2003 and the third showing of the A500 centerline twin, Adam Aircraft reports that they took nine orders for its two aircraft models during EAA AirVenture 2004.

Having surprised spectators last year with the arrival of the A700, Adam Aircraft provided yet another new experience for show-goers this year. The A700 that arrived at Oshkosh claims to be the first flying aircraft in the closely followed personal jet segment to have an installed interior featuring seven seats and an aft lavatory. Hundreds of visitors sat in the A700 and experienced the new class of aircraft.

The A500 made its third showing at Oshkosh this year and continues to make slow, much-delayed progress toward FAA Type Certification. Since this summer, the A500 has claimed three national and two world records for speed over a recognized course. On one flight from Los Angeles to Denver, the A500 averaged 279 MPH and completed the trip in 2 hours 59 minutes. Other record flights are planned around Adam Aircraft's participation in the NBAA and AOPA trade shows later this fall.

With more than 60 orders reported for the A500, Adam Aircraft reports that it has accumulated a strong customer base. Certification of the A500 is nearing the final stages, after several years of delays. With 98% FAA conformity on the aircraft, 94% completion of structural testing, and 66% completion of system testing, Adam Aircraft is forecasting Type Inspection Authorization (TIA) by month-end. Once TIA is achieved, they hope for 12 additional weeks of flight and systems tests before Initial Type Certification and an additional four weeks before full certification -- which assumes that there are no delays in the above-mentioned timeline (and noting that their previous prognostications have been WAY off the mark). Company officials expect that the A500 will be fully certified by year-end 2004.

FMI: www.adamaircraft.com

Advertisement

More News

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Introduces New 45-watt Charging Ports for 14- and 2>[...]

ANN's Daily Aero-Term (10.15.25): En Route Automation System (EAS)

En Route Automation System (EAS) The complex integrated environment consisting of situation display systems, surveillance systems and flight data processing, remote devices, decisi>[...]

Aero-News: Quote of the Day (10.15.25)

“Our Kodiak aircraft family is uniquely designed to meet the rigorous demands of such deployments, bringing short takeoff and landing performance, robust cargo capacity and e>[...]

ANN's Daily Aero-Linx (10.15.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

NTSB Final Report: Jeremy S Lezin Just SuperSTOL

Left Main Landing Gear Struck A Bush, And The Right Wingtip Impacted The Ground Analysis: According to the pilot of the tailwheel-equipped airplane, he noticed that the engine oil >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC