Embraer Reaches Record Backlog In Second Quarter 2015 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jul 17, 2015

Embraer Reaches Record Backlog In Second Quarter 2015

Includes $2.6 Billion In Firm Orders Announced At Paris Air Show

At the end of the second quarter of 2015, Embraer's firm order backlog reached $22.9 billion, the highest level in the Company's history. At the end of the previous quarter, in March 2015, the firm order backlog totaled $20.4 billion.

During the quarter, the Company delivered 27 jets to the commercial aviation market and 33 jets to the business aviation market, for a total of 60 aircraft - compared to 58 aircraft delivered the same period last year.

The main highlights of the quarter were $2.6 billion in firm orders at current list prices, announced at the Paris International Air Show. This included seven E190 for China's Colorful Guizhou Airlines, eight E175 for SkyWest Airlines, which will be operated by Alaska Airlines, ten E175 for United Express and 15 E190-E2 and ten E195-E2 for the lessor Aircastle - excluding options and purchase rights under the contracts.

In May, Embraer had already announced an order for 22 aircraft (20 E195 and two E190-E2) from Tianjin Airlines, making it the first Chinese airline to order the E-Jets E2. In the same period, another contract was announced with Azul Linhas Aereas Brasileiras SA for the firm order of 30 E195-E2 jets.

(Image from file)

FMI: www.embraer.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC