Astronauts Complete Second STS-126 Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneUnlimited-
10.14.25

Airborne-Unlimited-10.15.25

Airborne-NextGen-10.16.25

AirborneUnlimited-10.17.25

Fri, Nov 21, 2008

Astronauts Complete Second STS-126 Spacewalk

Replace 11 Of 12 Bearings In Solar Array Joint

The crew of the International Space Station celebrated the orbiting lab's 10th anniversary Thursday with a spacewalk by astronauts Heidemarie Stefanyshyn-Piper and Shane Kimbrough.

The second of four planned spacewalks planned for STS-126 began 45 minutes early, at 12:58 pm EST, and ended at 7:43 pm, running 15 minutes longer than its scheduled 6-and-a-half hours. Replacement of 11 of the 12 trundle bearings in the starboard Solar Alpha Rotary Joint race ring was successfully completed.

The repair comes almost a year after astronaut Dan Tani, in a spacewalk on November 24, 2007, noticed metallic debris on a main gear bearing race, suggesting metal-on-metal grinding which could lead to a failure of the joint.

The bearings allow rotating the solar array to track the position of the sun, which is essential to maximize power generation. The first of the 12 bearings was replaced back in June.

Now safely put in the shuttle Endeavour's payload bay, the bearings will be returned to Earth, where they'll be inspected, and engineers will try to determine what caused premature failure by subjecting the remaining good bearings to further analysis.

FMI: www.nasa.gov/station

Advertisement

More News

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

Airborne 10.14.25: Laser Threat, VeriJet BK, Duffy Threatens Problem Controllers

Also: USAF Pilots, Atlanta Tower Evac, Archer Spotlight Dissipates, Hop-A-Jet Sues A social-media call for people to point lasers at aircraft flying over Portland’s ICE facil>[...]

Aero-News: Quote of the Day (10.20.25)

“We developed this prototype from concept to reality in under a year. The U-Hawk continues the Black Hawk legacy of being the world’s premier utility aircraft and opens>[...]

ANN's Daily Aero-Term (10.20.25): Flameout Pattern

Flameout Pattern An approach normally conducted by a single-engine military aircraft experiencing loss or anticipating loss of engine power or control. The standard overhead approa>[...]

NTSB Final Report: Schweizer SGS 2-33A

Student Pilot’s Failure To Maintain Airspeed And Altitude Resulting In A Collision With The Ground During The Base To Final Turn Analysis: The solo student pilot reported she>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC