G250 Completes Natural Icing Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Mar 26, 2011

G250 Completes Natural Icing Tests

Aircraft Now Involved In Function And Reliability Testing

Gulfstream's second G250 flight-test aircraft has recently successfully completed natural icing tests, bringing the aircraft several steps closer to its certification later this year by the FAA and the Civil Aviation Authority of Israel. Serial Number (S/N) 2002 left its home base in Israel last month, crossed the Atlantic and landed in Smryna, TN, where it spent several weeks flying to the Great Lakes region to hunt for natural icing conditions aloft.

The G250 successfully completed the test points required for certification, including allowing ice to build up on the aircraft's unprotected surfaces and then verifying the aircraft's stability and control characteristics, as well as evaluating the ice protection systems and the tolerance of the aircraft after being exposed to icing conditions for 45 minutes. "The G250 performed exceptionally well," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "During one particular flight, the crew encountered icing concentrations in excess of the regulatory design envelope. The aircraft remained in this condition for an equivalent icing exposure time of more than 50 minutes to allow adequate accumulation of ice. Despite the extremely demanding conditions and ice accumulation on all untreated surfaces, the aircraft performed flawlessly."

The anti-ice system on the leading edge of the G250 wing was adapted from large-cabin Gulfstream aircraft. Heated bleed air from the engines is routed to the leading edges to prevent ice formation. S/N 2002 will now undergo overnight cold-soak trials, having completed a similar test in Finland. The aircraft has also completed hot-weather testing on the coast of the Red Sea.

S/N 2003 has started function and reliability testing in Israel, where the G250 is manufactured in cooperation with Israel Aerospace Industries (IAI). Function and reliability tests demonstrate that the aircraft, its components and its systems consistently operate as expected. Reaching this point is considered a major milestone toward certification. 

With flight test well under way, manufacturing continues for the first production aircraft, S/N 2004. The empennage and wing have been joined to the fuselage, and installation of the aircraft's systems has begun. Component-level fatigue testing on the main landing gear and rudder continues, while the full-up fatigue test article, S/N 1999, proceeds with preparation for testing over 40,000 cycles.

The three aircraft in the flight-test program have already accrued more than 955 hours in 324 flights.

FMI: www.gulfstream.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC