FAA Set To Open More Grand Canyon Air Tour Slots | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Feb 11, 2014

FAA Set To Open More Grand Canyon Air Tour Slots

Flights Will Be Restricted To Operators Using 'Quiet Technology'

The FAA is set to open up 1,721 flight allocations for Grand Canyon tour flights that it had abandoned in the past, as long as the flights do not increase the overall noise in the park.

The Associated Press reports that the Transportation bill passed in 2012 required the FAA and National Park Service to develop incentives for the use of "quiet air technology" (QT) at the Grand Canyon. The Park Service has already reduced the fee per flight from $25 to $20 for such aircraft. A formula that accounts for noise certification levels and number of seats is used to determine if an aircraft can be considered "quiet."

A notice posted in the Federal Register last week states "This is a one-time release of FAA-held allocations that will be available to operators for quiet aircraft technology flights during the 2014 air tour season and beyond. The FAA and NPS are continuing to make progress on additional quiet aircraft technology incentives for commercial air tour operators in Grand Canyon National Park."

The Federal Register indicates that the FAA currently holds 49 allocations in the Dragon and Zuni Point corridors of the park and 1,672 allocations elsewhere in the park Special Flight Rules Area (SFRA) that it intends to release to commercial air tour operators that currently hold allocations in proportion to the number of QT operations that are flown by the respective operators in these areas during the first six months of calendar year 2014. These allocations are within the total annual number that are authorized to be flown in the Dragon and Zuni Point corridors and elsewhere in the SFRA, respectively, under 14 CFR Part 93, Subpart U. They will be used for operations using QT, as defined in Appendix A of 14 CFR Part 93, Subpart U.

FMI: Federal Register Notice

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC