Mitsubishi Regional Jet Starts Full-Scale Tests Expected To Lead To First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jan 16, 2015

Mitsubishi Regional Jet Starts Full-Scale Tests Expected To Lead To First Flight

Initial Engine Run Performed On First Flight Test Aircraft

Mitsubishi Aircraft Corporation started full-scale testing of the Mitsubishi Regional Jet (MRJ) in anticipation of its first flight scheduled in the second quarter this year.

Mitsubishi Aircraft performed the first engine run for the starboard side engine of MRJ’s first flight test aircraft at the apron of the Nagoya Airport (Nishikasugai-gun, Aichi Prefecture) on January 13th, 2015. The first engine run verified the total operations of the aircraft’s various systems including hydraulic, fuel, air conditioning, electric systems and power system such as engines.

The company also performed the wing up-bending test on the static strength test aircraft at the strength test station adjacent to Komaki South Plant of MHI's Nagoya Aerospace Systems Works (Nishikasugai-gun, Aichi Prefecture) on December 25th, 2014. The static strength test is one of the airframe tests to inspect that the aircraft meets safety standards in strength. During the testing, the maximum load that the aircraft is expected to experience while flying was applied to the wing of the static strength test aircraft, which was calculated from simulation of all flight conditions. The wing up-bending test produced anticipated results.
 
Mitsubishi Aircraft remains firmly committed to the success of the first flight with an on-track progress of the upcoming tests, such as functional tests and engineering tests.

(Image provided by Mitsubishi Heavy Industries)

FMI: www.mrj-japan.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC