Mitsubishi Regional Jet Starts Full-Scale Tests Expected To Lead To First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Jan 16, 2015

Mitsubishi Regional Jet Starts Full-Scale Tests Expected To Lead To First Flight

Initial Engine Run Performed On First Flight Test Aircraft

Mitsubishi Aircraft Corporation started full-scale testing of the Mitsubishi Regional Jet (MRJ) in anticipation of its first flight scheduled in the second quarter this year.

Mitsubishi Aircraft performed the first engine run for the starboard side engine of MRJ’s first flight test aircraft at the apron of the Nagoya Airport (Nishikasugai-gun, Aichi Prefecture) on January 13th, 2015. The first engine run verified the total operations of the aircraft’s various systems including hydraulic, fuel, air conditioning, electric systems and power system such as engines.

The company also performed the wing up-bending test on the static strength test aircraft at the strength test station adjacent to Komaki South Plant of MHI's Nagoya Aerospace Systems Works (Nishikasugai-gun, Aichi Prefecture) on December 25th, 2014. The static strength test is one of the airframe tests to inspect that the aircraft meets safety standards in strength. During the testing, the maximum load that the aircraft is expected to experience while flying was applied to the wing of the static strength test aircraft, which was calculated from simulation of all flight conditions. The wing up-bending test produced anticipated results.
 
Mitsubishi Aircraft remains firmly committed to the success of the first flight with an on-track progress of the upcoming tests, such as functional tests and engineering tests.

(Image provided by Mitsubishi Heavy Industries)

FMI: www.mrj-japan.com

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC