EPS Diesel Pre-Certification Evaluation Shows Promising Results | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Jul 29, 2017

EPS Diesel Pre-Certification Evaluation Shows Promising Results

Has Undergone High Altitude And High Temperature Testing

By: Gene Yarbrough

Michael Fuchs presented preliminary testing results for the EPS 4.3 liter diesel engine in development during a media briefing at AirVenture.

The engine, an 8 cylinder 180 degree horizontally opposed mill, targeting the O-540/550 family has showed good performance in testing aimed at certification. The Graflight V-8 engine employs an electronic control system designed and manufactured by industry leader Bosch General Aviation Technology to dramatically reduce pilot workload and ensure efficiency and ease of operation. The engine is controlled with a single power lever, leaving traditional pilot chores like propeller pitch, fuel mixture and controlling engine temperature to the computer, reducing the risk of pilot error.

The engine is designed with extremely rugged technologies, like steel pistons and CGI iron crankcases that provide superior strength and durability over aluminum without sacrificing weight. This reduces maintenance costs significantly by increasing the targeted Time Between Overhauls (TBO) to 3,000 hours, a 50 to 100 percent increase over the industry’s current values of 1,500 to 2,000 hours.

The engine has undergone high altitude testing in Colorado and high temperature testing in Arizona, both efforts indicating operating in these extremes as expected with no adverse behaviors thus far. The engine is rated at 408 horsepower for takeoff and will maintain that output to 30,000 ft with an expected TBO of 3000 hrs.

Fuchs stated that although the development process is long and costly the company has funding in place to achieve their production certificate and enter production with first deliveries expected "soon" without committing to a firm date.

(Image from file)

FMI: eps.aero

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC