NASA Administrator Marks Completion Of World’s Largest Spacecraft Welding Tool | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Sep 09, 2014

NASA Administrator Marks Completion Of World’s Largest Spacecraft Welding Tool

Space Launch System Assembly Mechanism To Be Unveiled September 12

NASA’s new Vertical Assembly Center (VAC), a 170-foot-high marvel of machinery that will be used to assemble elements of the agency's Space Launch System (SLS), is now complete and ready to weld parts for the rocket that is designed to send humans on deep space missions.

NASA Administrator Charles Bolden will be among those to attend the ribbon cutting for the enormous new tool at 11 a.m. EDT Friday, Sept. 12, at the agency's Michoud Assembly Facility in New Orleans where the core stage is being built.

The Vertical Assembly Center will be used to join domes, rings and barrels segments to complete the SLS fuel tanks. The tool also will be used to perform evaluations of the completed welds. Towering more than 200 feet tall, with a diameter of 27.6 feet, the core stage will store cryogenic liquid hydrogen and liquid oxygen to feed the vehicle’s RS-25 engines.

Bolden also will visit NASA's Stennis Space Center near Bay St. Louis, Mississippi, following the Michoud events to tour the historic B-2 Test Stand, along with other NASA representatives. The B-2 Test Stand was used to test the S-1C stage on the Saturn V moon rocket and the Main Propulsion Test Article, the configuration of three main engines flown on space shuttle missions. The stand will next be used to test the core stage of SLS and its configuration of four RS-25 engines.

(NASA artist's depiction of SLS launch)

FMI: www.nasa.gov/sls

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC