First Soyuz Almost Ready For Launch From French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, May 06, 2011

First Soyuz Almost Ready For Launch From French Guiana

Dry Runs Underway To Test Facilities

The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle.

Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

The rehearsal is simulating the five-day final phase before launch. The final countdown will be performed, including the gantry's rollback to its parked position, about 250 feet from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption.

The countdown resumed Thursday with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011.

FMI: www.arianespace.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC