Airlander 10 In Final Stages Of Preparation For First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Mon, Mar 28, 2016

Airlander 10 In Final Stages Of Preparation For First Flight

Hybrid Aircraft Nearly Complete After Attachment Of Major Components

The Airlander 10 is almost complete and ready to leave the hangar after a succession of momentous attachments to the hull.

The first of the major attachments to the hull was the lower port fin. The massive 11 x 9 m (36 X 28 foot) fin was lifted onto the hull by a huge crane and then attached by our expert team.

Next it was the turn for one of the four 350 hp, 4 litre V8 direct injection, turbocharged diesel engines to be hoisted up onto the stern of the hull; it was attached to five carbon composite battens that had been secured in readiness.

Even though this was done after quitting time, the company says many of its proud members of staff stayed to watch as history was made.

There was no chance for a rest after the huge engine was fitted as the payload module was delivered and maneuvered under the enormous hull. The payload module, another light but durable carbon composite structure, is the area behind the cockpit where the passengers or cargo will be carried.

Following this the upper starboard fin was affixed using a crane and two cherry pickers.

Earlier in the week, the first LERX (Leading-edge root extension) being affixed to the port fin and on March 9, the other upper fin was affixed to the hull, as well as the second pylon; the pylon is on the side of the hull at the front of the Airlander and will house one of the vectored engines, which will rotate during take-off and landing.

By the end of this month, the company says the final attachments will have been made and the payload module completed.

(Images provided with Hybrid Air Vehicles news release)

FMI: www.hybridairvehicles.com


Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC